Case Study – Challenges Encountered during Concurrent Implementation of Remedial Strategies at a Solvent Site

Presented on Monday, December 3, 2018
Jim Helge1, Jeriann Alexander1, Karen Emery2, Jennifer Wilson2, Joe Whearty2 and Kyle Johnson1, (1)Fugro USA Land, Inc., Sacramento, CA, (2)Fugro USA Land, Inc., Walnut Creek, CA

Groundwater, soil, and soil vapor below a former dry-cleaning facility are contaminated by tetrachloroethene (PCE) and various petroleum hydrocarbon compounds. Plumes of the various chemicals of concern are commingled onsite and have been delineated to extend below several city blocks. Fugro was retained by California Department of General Services to address risks posed, and to remediate the site for redevelopment. A Soil Vapor Extraction (SVE) system was the first remedy installed to mitigate vapor intrusion risk to nearby receptors. Thermal Desorption using Electrical Resistance Heating (ERH) was selected to remove contaminant mass in the Source Area. During ERH activities, Enhanced Reductive Dechlorination (ERD) in groundwater was implemented for the distal plume to promote the breakdown of PCE to its less harmful by-products. During operation of concurrent remedial technologies, several challenges required swift and dynamic changes in remedial system management. Notable challenges that arose include:
  • Chemical desorption of petroleum by-products required a change in the SVE monitoring program to address the increase in contaminant vapor stream waste loading.
  • Recovered steam contained more sediment than anticipated which complicated condensate treatment and disposal.
  • Heavy rainfall during the winter of 2016-2017 caused groundwater elevations to rise above a semi-confining layer, complicating vapor control and contributing to desorbed contaminant migration beyond the initial capture zone.

Positive effects have also been observed with the addition of ERH into the remedial strategy. These include:

  • Warmer groundwater temperatures induced by ERH have allowed dehalococcoides bacteria colonies to thrive.
  • Lateral spread of the inoculants injected during ERD near the Source Area appears to have extended beyond the application area.

Our collaborative working relationship with the ERH contractor allowed real-time solutions to challenges in treatment, waste capture, and monitoring methodologies, leading to a successful project.



Jim Helge
Fugro USA Land, Inc., Sacramento, CA
Project Manager - Senior Environmental Scientist
Jeriann Alexander
Fugro USA Land, Inc., Sacramento, CA
Group Manager - Principle Engineer
Karen Emery
Fugro USA Land, Inc., Walnut Creek, CA
Associate Geologist
Jennifer Wilson
Fugro USA Land, Inc., Walnut Creek, CA
Senior Project Geologist
Joe Whearty
Fugro USA Land, Inc., Walnut Creek, CA
Senior Staff Geologist
Kyle Johnson
Fugro USA Land, Inc., Sacramento, CA
Senior Staff Geologist
NGWA may only post those brown bag sessions, Webinars, event sessions, and like for which we have obtained copyright permission from the presenter. Furthermore, by accessing or downloading any of these items, you agree they are for your own personal use and may not be disseminated by any means to others via any medium. Click here to read NGWA's proprietary legend and disclaimers before proceeding.